Slider

Vessel Information

Print Vessel Report Q88

TP VENTURE
TANKER
60,434
49,999
13.25
32.20
TO BE NOMINATED
TO BE NOMINATED
9895202
2021
2.10
75.28
11.929
183.07
14.029

SENOKO POWER STATION
Vessel is cleared for Senoko jetty.
There will be tidal restrictions for her berthing/unberthing if her draft exceeds 9.0m.
Berthing/unberthing will not be possible if she is loaded to her summer draft of 13.25m.

 

SERAYA POWER STATION (GO OPS)
Vessel is suitable for Jetty 1 & 2.
There will be tidal restrictions for her berthing/unberthing at Jetty 1 & 2 if her draft exceeds 11.4m and 11.1m respectively.
Vessel's ballast freeboard including the manifold height is within Jetty 1 & 2 GO MLAs working envelopes.

TRANSPETROL TM AS

19/12/24: TO BE NOMINATED

NAME CHANGE: VENTURE III TO TP VENTURE (18/12/24)

24/06/24: EVALUATION, RATING: ELIGIBLE, REASON: SIRE REPORT (04/06/24)

27/08/23: EVALUATION (PS FOR GO OPS), RATING: ELIGIBLE, REASON: SIRE REPORT (22/08/23)

18/07/23: EVALUATION (PS FOR GO OPS), RATING: ELIGIBLE, REASON: SIRE REPORT (01/04/23)

17/02/23: EVALUATION (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (10/02/23)

13/02/23: EVALUATION (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (02/11/22)

29/11/22: EVALUATION (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (02/11/22)

07/07/22: EVALUATION, RATING: ELIGIBLE, REASON: SIRE REPORT (07/06/22)

30/01/22: EVALUATION (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (28/10/21)

18/11/21: EVALUATION (PS FOR GO OPS), RATING: ELIGIBLE, REASON: SIRE REPORT (28/10/21)

24/08/21: EVALUATION (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (02/05/21)

06/07/21: INCIDENT, BLACKOUT AND ME FAILURE DUE TO POOR QUALITY VLSFO (BLACKOUT), INDIAN OCEAN OFF OPL GALLE SRI LANKA

VETTED: 18/06/21 (SP), RATING: ELIGIBLE, REASON: SIRE REPORT (02/05/21)

Email: safe-ships@safe-ships.sg