SERAYA POWER STATION
Vessel is not cleared for Gasoil Operations.
Vessel's LOA of 69.98m is below Jetty 1 & 2 minimum LOA requirement of 110m & 95m respectively.
Her Ballast PBL of 27.0m is below the minimum Ballast PBL requirement of 45m for Jetty 4.
There are no jetties suitable for berthing the vessel for Gasoil Operations.
SKIPS MARINE SERVICES PTE LTD
10/04/17: EVALUATION (PS FOR GO OPS), RATING: UNSUITABLE, REASON: NO SIRE/TERMINAL INSPECTION REPORT AND INSUFFICIENT LOA & BALLAST PBL
VETTED: 06/05/16, RATING: UNSUITABLE, REASON: NO SIRE/TERMINAL INSPECTION REPORT