SERAYA POWER STATION (FO OPS)
Vessel is suitable for Jetty 1 only.
There will be tidal restrictions for her berthing/unberthing if her draft exceeds 11.4m.
Her Summer displacement of 183,887MT exceeded Jetty 1 acceptance criteria of 127,000MT.
Vessel should be reminded that her displacement should not exceed 127,000MT at all times.
Vessel's ballast freeboard including the manifold height is 17.13m which exceeded Jetty 1 MLAs working envelopes of 17.1m.
Vessel should be reminded that her ballast freeboard including the height of her manifold should not exceed 17.1m at MHWS 3.0m at all times when alongside.
To monitor her freeboard closely especially towards the end of the discharge operation and during period of high tides.
Berthing/unberthing will be subjected to daylight hours only as her Gross Tonnage is more than 75,000MT.
SENOKO POWER STATION
Vessel is cleared subject to her having sufficient mooring ropes for a mooring pattern of 4-2-2 forward & aft.
There will be tidal restrictions for her berthing/unberthing if her draft exceeds 9.0m.
Berthing/unberthing will not be possible if she is loaded to her summer draft of 17.168m.
Her Summer displacement of 183,887MT exceeded Senoko's Jetty maximum acceptance criteria of 120,000MT.
Vessel should be reminded that her displacement should not exceed 120,000MT at all times.
Vessel's ballast freeboard including the manifold height is 17.13m which is close to the MLAs working envelope of 17.2m.
Vessel should be reminded that her ballast freeboard including the height of her manifold should not exceed 17.2m at MHWS 3.1m at all times when alongside.